In early 2025, Vietranstimex successfully completed the Wind Turbine Blade Transportation for major project sites in Ninh Thuan and Quang Tri. This was more than just a logistical task; it was a high-stakes technical ‘battle’ between human expertise and the harsh landscapes of Central Vietnam.
The Challenges of Wind Turbine Blade Transportation in Central Vietnam
Wind turbine blade transportation, with blades exceeding 80 meters in length and weighing over 30 tons each, is always a complex puzzle. In Ninh Thuan and Quang Tri, the challenge was doubled by sharp curves and steep gradients that demanded absolute traction and balance.
Beyond the terrain, the Vietranstimex team faced significant infrastructure hurdles, including narrow roads, weak bridges, and dense overhead power lines. These obstacles required meticulous clearance plans. Furthermore, unpredictable strong winds and fluctuating temperatures in the highlands posed constant threats to the stability of the blades during transit.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Confirming the Stature of a Global Top 50 Heavy Lift Specialist
To navigate narrow passages and winding mountain passes, Vietranstimex deployed the most advanced specialized equipment available:
- Blade Adaptor: This cutting-edge technology allows the blade to be lifted to high angles (up to 60 degrees) or rotated 360 degrees. This flexibility is crucial for dodging obstacles like houses and utility poles or navigating hairpin turns that conventional trailers simply cannot manage.
- 10-Axle Hydraulic Modular Trailers: With a lifting capacity of up to 340 tons, this system ensures even weight distribution, protecting road infrastructure while maintaining the stability of oversized and overweight cargo.
The technical team at Vietranstimex conducted extensive Route Surveys months in advance. Every curve was simulated using specialized software to calculate the precise “swept path” of the blades. The seamless coordination between prime mover drivers, Adaptor operators, and local authorities ensured a smooth journey. Every meter conquered was a testament to the bravery and skill of Vietnam’s leading technical team.
This success in Ninh Thuan and Quang Tri further enriches Vietranstimex’s portfolio, joining major projects like the Dam Nai, Huong Linh, and various Central Highlands wind farms.
See more: SOTRANS Logistics breaks ground on Vietnam’s largest and most advanced chemical warehouse
Mastering the art of wind turbine blade transportation not only ensures the progress of national renewable energy projects but also reaffirms Vietranstimex’s prestige in the IC50 (KHL, UK) rankings – the Top 50 largest heavy transport enterprises in the world.
(SOTRANS Group News)






